INTERTANKO'S STANDARD TANKERVersion 3
CHARTERING QUESTIONNAIRE 88 (Q88)Created at Q88.com
1.VESSEL DESCRIPTION
1.1Date updated:Jul 19, 2010
1.2Vessel's name:Sichem Osprey
1.3IMO number:9396024
1.4Vessel's previous name(s) and date(s) of change:Not Applicable
1.5Date delivered:Apr 07, 2009
1.6Builder (where built):Dae Sun Shipbuilding & Engineering Co. Ltd, Busan, Korea
1.7Flag:Malta
1.8Port of Registry:Valletta
1.9Call sign:9HTP9
1.10Vessel's satcom phone number:+870 764903595
Vessel's fax number:+870 764903597
Vessel's telex number:424953410
Vessel's email address:sichem.osprey@gtships.com
1.11Type of vessel:Chemical
1.12Type of hull:Double Hull
Classification
1.13Classification society:American Bureau of Shipping
1.14Class notation:+A1, Chemical Carrier, Oil Carrier, (E), +AMS, +ACCU, VEC, TCM, SH, SHCM
1.15If Classification society changed, name of previous society:
1.16If Classification society changed, date of change:Not Applicable
1.17IMO type, if applicable:2,3
1.18Does the vessel have ice class? If yes, state what level:Yes , +A1
1.19Date / place of last dry-dock:Jun 30, 2010 Dalian, China
1.20Date next dry dock due
1.21Date of last special survey / next survey due:Jul 18, 2010 Apr 08, 2014
1.22Date of last annual survey:Jul 18, 2010
1.23If ship has Condition Assessment Program (CAP), what is the latest overall rating:
1.24Does the vessel have a statement of compliance issued under the provisions of the Condition Assessment Scheme (CAS): If yes, what is the expiry date?N/A
Not Applicable
Dimensions
1.25Length Over All (LOA):170.109 M
1.26Length Between Perpendiculars (LBP):161.00 M
1.27Extreme breadth (Beam):26.20 M
1.28Moulded depth:15.60 M
1.29Keel to Masthead (KTM) / KTM in collapsed condition (if applicable):41.76 M M
1.30Bow to Center Manifold (BCM) / Stern to Center Manifold (SCM):87.21 M82.90 M
1.31Distance bridge front to center of manifold:50.3 M
1.32Parallel body distances:LightshipNormal BallastSummer Dwt
Forward to mid-point manifold:27.10 M31.32 M37.56 M
Aft to mid-point manifold:26.10 M32.80 M38.80 M
Parallel body length:53.20 M64.12 M76.36 M
1.33FWA at summer draft / TPC immersion at summer draft:217 MM37.37 MT
1.34What is the max height of mast above waterline (air draft)Full MastCollapsed Mast
Lightship:39.117 M0.000 M
Normal ballast:34.962 M0.000 M
At loaded summer deadweight:31.744 M0.000 M
Tonnages
1.35Net Tonnage:6662
1.36Gross Tonnage / Reduced Gross Tonnage (if applicable):17789 13709
1.37Suez Canal Tonnage - Gross (SCGT) / Net (SCNT):18745.19 15957.82
1.38Panama Canal Net Tonnage (PCNT):14875
Loadline Information
1.39LoadlineFreeboardDraftDeadweightDisplacement
Summer:5.612 M10.016 M25431 MT32445 MT
Winter:5.820 M9.808 M24467 MT31667 MT
Tropical:5.404 M10.224 M26023 MT33223 MT
Lightship:12.957 M2.643 M 7013.3 MT
Normal Ballast Condition:8.802 M6.798 M13735 MT20935 MT
1.40Does vessel have multiple SDWT?No
1.41If yes, what is the maximum assigned deadweight? MT
Ownership and Operation
1.42Registered owner - Full style: Eitzen Chemical (Singapore) Pte. Ltd.
1 Temasek Avenue, Milenia Tower, #35-05, Singapore 039192
Tel: +6563255777
Company IMO#: 5128611
1.43Technical operator - Full style: V.Ships UK
Skypark, 8 Elliot Place, Glasgow G3 8EP, United Kingdom
Tel: +441412432435
Fax: +441412432436
Email: eitzen@vships.com
Company IMO#: 0758614
1.44Commercial operator - Full style: Eitzen Chemical, ASIA
One Temasek Avenue # 35-05 Millenia Tower Singapore 039192
Tel: +65 6557 7616
Email: oprasia@eitzen-chemical.com
1.45Disponent owner - Full style: N/A
 
2.CERTIFICATIONIssuedLast Annual
or Intermediate
Expires
2.1Safety Equipment Certificate:Jul 18, 2010 Jul 18, 2010 Apr 08, 2014
2.2Safety Radio Certificate:Apr 09, 2009 Jul 18, 2010 Apr 08, 2014
2.3Safety Construction Certificate:Jul 18, 2010 Jul 18, 2010 Apr 08, 2014
2.4Loadline Certificate:Aug 17, 2009 Jul 18, 2010 Apr 08, 2014
2.5International Oil Pollution Prevention Certificate (IOPPC):Apr 09, 2009 Jul 18, 2010 Apr 08, 2014
2.6Safety Management Certificate (SMC):Sep 30, 2009 Not Applicable Sep 21, 2014
2.7Document of Compliance (DOC):Aug 05, 2008 Not Applicable Jul 23, 2013
2.8USCG (specify: COC, LOC or COI): COC Jan 11, 2010 Jan 11, 2010 Jan 11, 2012
2.9Civil Liability Convention Certificate (CLC):Feb 04, 2010  Feb 20, 2011
2.10Civil Liability for Bunker Oil Pollution Damage Convention Certificate (CLBC):Feb 04, 2010  Feb 20, 2011
2.11U.S. Certificate of Financial Responsibility (COFR):Apr 16, 2009  Apr 16, 2012
2.12Certificate of Fitness (Chemicals):Jul 18, 2010 Jul 18, 2010 Sep 17, 2010
2.13Certificate of Fitness (Gas):Not Applicable Not Applicable Not Applicable
2.14Certificate of Class:Sep 24, 2009 Jul 18, 2010 Apr 08, 2014
2.15International Ship Security Certificate (ISSC):Sep 30, 2009 Sep 22, 2009 Sep 21, 2014
2.16International Sewage Pollution Prevention Certificate (ISPPC)Apr 09, 2009  Apr 08, 2014
2.17International Air Pollution Prevention Certificate (IAPP):Jul 18, 2009 Jul 18, 2010 Apr 08, 2014
Documentation
2.18Does vessel have all updated publications as listed in the Vessel Inspection Questionnaire, Chapter 2- Question 2.24, as applicable:Yes
2.19Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract:Yes
 
3.CREW MANAGEMENT
3.1Nationality of Master:Belarus
3.2Nationality of Officers:LITHUANIA, LATVIA, GEORGIA, RUSSIA
3.3Nationality of Crew:FILIPINO, LATVIA
3.4If Officers/Crew employed by a Manning Agency - Full style: Officers: BGI Riga
17A, Duntes str. Riga, LV-1005, Latvia
Tel: +371 6 750 6545
Fax: +371 6 750 6327
Telex: N/A
Email: kirills.ostapenko@baltic-crew.com
Crew: POMI
1535M Adriatico Street, Ermita 1000 Manila, Philippines
Tel: +63 9178143630
Fax: +63 25231896
Telex: N/A
Email: antonio.ladera@vships.com
3.5What is the common working language onboard:English
3.6Do officers speak and understand English:Yes
3.7In case of Flag Of Convenience, is the ITF Special Agreement on board:Yes
 
4.HELICOPTERS
4.1Can the ship comply with the ICS Helicopter Guidelines:No
4.2If Yes, state whether winching or landing area provided:
 
5.FOR USA CALLS
5.1Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter:Yes
5.2Qualified individual (QI) - Full style: O'Brain's Response Management Inc.
103 Morgan Lane, Suite 103 Plainsboro, NJ 08536, USA.
Tel: +1 985 781 0804
Fax: +1 985 781 0580
Telex: 49617361 OOPS UI
Email: commandcenter@oopsusa.com
5.3Oil Spill Response Organization (OSRO) -Full style: USCG NRC (National Response Corp)
3500 Sunrise Highway, Suite T103 Great River, New York 11739, USA
Tel: +1 202 267-2675
Fax: +1 916 845-8911
Telex: N/A
Email: iocdo@nrcc.com
5.4Has technical operator signed the SCIA / C-TPAT agreement with US customs concerning drug smuggling:
 
6.CARGO AND BALLAST HANDLING
Double Hull Vessels
6.1Is vessel fitted with centerline bulkhead in all cargo tanks:Yes
6.2If Yes, is bulkhead solid or perforated:Solid
Cargo Tank Capacities
6.3Capacity (98%) of each natural segregation with double valve (specify tanks): Seg #1: 1748.47 m3 (1 Port)
Seg #2: 1746.80 m3 (1 Stbd)
Seg #3: 2497.89 m3 (2 Port)
Seg #4: 2480.94 m3 (2 Stbd)
Seg #5: 2618.78 m3 (3 Port)
Seg #6: 2610.55 m3 (3 Stbd)
Seg #7: 2622.81 m3 (4 Port)
Seg #8: 2610.57 m3 (4 Stbd)
Seg #9: 2619.34 m3 (5 Port)
Seg #10: 2607.42 m3 (5 Stbd)
Seg #11: 2491.51 m3 (6 Port)
Seg #12: 2474.42 m3 (6 Stbd)
Seg #13: 781.67 m3 (Slop Tank port)
Seg #14: 781.06 m3 (Slop tank starboard)
6.4Total cubic capacity (98%, excluding slop tanks):29129.5 M3
6.5Slop tank(s) capacity (98%):1531.48 M3
6.6Residual/Retention oil tank(s) capacity (98%), if applicable: M3
6.7Does vessel have Segregated Ballast Tanks (SBT) or Clean Ballast Tanks (CBT):SBT
SBT Vessels
6.8What is total capacity of SBT?13723.76 M3
6.9What percentage of SDWT can vessel maintain with SBT only:54 %
6.10Does vessel meet the requirements of MARPOL Annex I Reg 18.2: (previously Reg 13.2)Yes
Cargo Handling
6.11How many grades/products can vessel load/discharge with double valve segregation:14
6.12Maximum loading rate for homogenous cargo per manifold connection:2280 M3/HR
6.13Maximum loading rate for homogenous cargo loaded simultaneously through all manifolds:2280 M3/HR
6.14Are there any cargo tank filling restrictions. If yes, please specify:Yes
Max. load rate for one tank: 380 Cu. Metres; Max. manifold pressure: 10 Bars
Pumping Systems
6.15Pumps:No.TypeCapacity
Cargo:21
7
Centrifugal
Centrifugal
380 M3/HR
150 M3/HR
Stripping: M3/HR
Eductors: M3/HR
Ballast:2 Centrifugal 500 M3/HR
6.16How many cargo pumps can be run simultaneously at full capacity:6
Cargo Control Room
6.17Is ship fitted with a Cargo Control Room (CCR):Yes
6.18Can tank innage / ullage be read from the CCR:Yes
Gauging and Sampling
6.19Can ship operate under closed conditions in accordance with ISGOTT:Yes
6.20What type of fixed closed tank gauging system is fitted:Radar
6.21Are overfill (high-high) alarms fitted? If Yes, indicate whether to all tanks or partial:All cargo tanks
Vapor Emission Control
6.22Is a vapor return system (VRS) fitted:Yes
6.23Number/size of VRS manifolds (per side): 2 250 MM
Venting
6.24State what type of venting system is fitted:Individual
Cargo Manifolds
6.25Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment':Yes
6.26What is the number of cargo connections per side:14
6.27What is the size of cargo connections:150 MM
6.28What is the material of the manifold:Stainless Steel
Manifold Arrangement
6.29Distance between cargo manifold centers:1000 MM
6.30Distance ships rail to manifold:4600 MM
6.31Distance manifold to ships side:5140 MM
6.32Top of rail to center of manifold:760 MM
6.33Distance main deck to center of manifold:2100 MM
6.34Manifold height above the waterline in normal ballast / at SDWT condition:10.902 M7.684 M
6.35Number / size reducers: 6 x 150/200mm (6/8")
4 x 150/250mm (6/10")
2 x 150/300mm (6/12")
1 x 200/300mm (8/12")
12 x 150/150mm (6/6")
Stern Manifold
6.36Is vessel fitted with a stern manifold:No
6.37If stern manifold fitted, state size: MM
Cargo Heating
6.38Type of cargo heating system?Deck-mounted Heat Exchangers
6.39If fitted, are all tanks coiled?No
6.40If fitted, what is the material of the heating coils:Stainless Steel
6.41Maximum temperature cargo can be loaded/maintained:66.0 °C / 150.8 °F 66 °C / 150.8 °F
Tank Coating
6.42Are cargo, ballast and slop tanks coated?CoatedTypeTo What Extent
Cargo tanks:Yes Epoxy Phenolic and Zinc Interline 104 Whole Tank
Ballast tanks:Yes Epoxy Phenolic Whole Tank
Slop tanks:Yes Epoxy Phenolic Whole Tank
6.43If fitted, what type of anodes are used:Zinc
 
7.INERT GAS AND CRUDE OIL WASHING
7.1Is an Inert Gas System (IGS) fitted:Yes
7.2Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen:Nitrogen Generator
7.3Is a Crude Oil Washing (COW) installation fitted:No
 
8.MOORING
8.1Mooring wires (on drums)No.DiameterMaterialLengthBreaking Strength
Forecastle: MM M MT
Main deck fwd: MM M MT
Main deck aft: MM M MT
Poop deck: MM M MT
8.2Wire tailsNo.DiameterMaterialLengthBreaking Strength
Forecastle: MM M MT
Main deck fwd: MM M MT
Main deck aft: MM M MT
Poop deck: MM M MT
8.3Mooring ropes (on drums)No.DiameterMaterialLengthBreaking Strength
Forecastle:4 50 MMMEGAFLEX 200 M50.0 MT
Main deck fwd:1 50 MMMEGAFLEX 200 M50.0 MT
Main deck aft:1 50 MMMEGAFLEX 200 M50.0 MT
Poop deck:4 50 MMMEGAFLEX 200 M50.0 MT
8.4Other mooring linesNo.DiameterMaterialLengthBreaking Strength
Forecastle:5 54 MMMEGAFLEX 200 M57.6 MT
Main deck fwd: MM M MT
Main deck aft: MM M MT
Poop deck:5 54 MMMEGAFLEX 200 M57.6 MT
8.5Mooring winchesNo.# DrumsBrake Capacity
Forecastle:4 Double Drums 39 MT
Main deck fwd:1 Double Drums 39 MT
Main deck aft:1 Double Drums 39 MT
Poop deck:4 Double Drums 39 MT
8.6Mooring bittsNo.SWL
Forecastle:4 64 MT
Main deck fwd:6 48.5 MT
Main deck aft:4 48.5 MT
Poop deck:10 48.5 MT
8.7Closed chocks and/or fairleads of enclosed typeNo.SWL
Forecastle:2 + 4 48.5 MT
Main deck fwd:8 48.5 MT
Main deck aft:6 48.5 MT
Poop deck:12 48.5 MT
Emergency Towing System
8.8Type / SWL of Emergency Towing system forward:Chain Stopper, Tongue Type 200 MT
8.9Type / SWL of Emergency Towing system aft:Storage Drum 200 MT
Anchors
8.10Number of shackles on port cable:11
8.11Number of shackles on starboard cable:11
Escort Tug
8.12What is SWL and size of closed chock and/or fairleads of enclosed type on stern:64 MT3600 mm x 2600 mm
8.13What is SWL of bollard on poopdeck suitable for escort tug:64 MT
Bow/Stern Thruster
8.14What is brake horse power of bow thruster (if fitted):1000 BHP745.7 KW
8.15What is brake horse power of stern thruster (if fitted): BHP0 KW
Single Point Mooring (SPM) Equipment
8.16Does vessel comply with the latest edition of OCIMF 'Recommendations for Equipment Employed in the Mooring of Vessels at Single Point Moorings (SPM)':Yes
8.17Is vessel fitted with chain stopper(s):Yes
8.18How many chain stopper(s) are fitted:1
8.19State type of chain stopper(s) fitted:Tongue Type
8.20Safe Working Load (SWL) of chain stopper(s):200 MT
8.21What is the maximum size chain diameter the bow stopper(s) can handle:76 MM
8.22Distance between the bow fairlead and chain stopper/bracket:3190 MM
8.23Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size:Yes
Lifting Equipment
8.24Derrick / Crane description (Number, SWL and location):Cranes: 1 x 10 Tonnes
Center midships
8.25What is maximum outreach of cranes / derricks outboard of the ship's side:7.9 M
Ship To Ship Transfer (STS)
8.26Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum or Liquified Gas, as applicable):Yes
 
9.MISCELLANEOUS
Engine Room
9.1What type of fuel is used for main propulsion?IFO 380 CST
9.2What type of fuel is used in the generating plant?IFO 380 CST
9.3Capacity of bunker tanks - IFO and MDO/MGO:1423.52 M3114.37 M3
66.14 M3
9.4Is vessel fitted with fixed or controllable pitch propeller(s)?Fixed Pitch
Insurance
9.5P & I Club - Full Style: BRITANNIA
Tindall Riley (Britannia) Limited New City Court 20 St Thomas Street London SE1 9RR
Tel: +44 2074073588
Fax: +44 2074033942
Telex: N/A
Email: N/A
9.6P & I Club coverage - pollution liability coverage:1000000000 US$
Port State Control
9.7Date and place of last Port State Control inspection:Jan 11, 2010 / Chesapia VA, USAke
9.8Any outstanding deficiencies as reported by any Port State Control:No
9.9If yes, provide details:
Recent Operational History
9.10Has vessel been involved in a pollution, grounding, serious casualty or collision incident during the past 12 months? If yes, full description:Pollution: No ,
Grounding: Yes , Run aground at Clipperton island on 10th of February, 2010
Serious casualty: No ,
Collision: No ,
9.11Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): Contact owner for details
Vetting
9.12Date/Place of last SIRE Inspection:Nov 26, 2009 / Tutuncifilc, Turkey
9.13Date/Place of last CDI Inspection:May 06, 2009 / Haldia, India
9.14Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:

*Blanket "approvals" are no longer given by Oil Majors and ships are accepted for the voyage on a case by case basis.
Contact owner for details.
Version 3 (INTERTANKO / Q88.com)